Sunwest Roof Report
Building A
Roof section 1 · TPO single-ply

Recommendation
Repair and keep. Reseal the open seam and the loose flashing, clear the drains, and review the roof for restoration in a future budget year.
Fix now
- Open seam beside the east rooftop unit
- Drain 2 clogged with debris
Plan this year
- Loose perimeter flashing on the north edge
- Worn sealant at pipe penetrations
Monitor
- Surface wear in the membrane field
- Ponding near drain 2 after heavy rain
Budget forecastYear 1: fix now items · Year 2: plan this year items · Years 3 to 5: restoration review
